Asbestos Permits
Prior to renovation or demolition of any structure, installation, or building, asbestos abatement approval is required to obtain a building permit. If load-bearing structures will be disturbed, a demolition and renovation notification is also required. These requirements do not apply to residential structures or projects affecting four or fewer single-family dwelling units.
Building Approval Form for Demolition
Application must be completed for demolition
Asbestos Demolition and Renovation Permit
Permit for demolition and renovation to asbestos-damaged structures